How it works

Plan → quantify → price → estimate → bid.

Metruno keeps the path from electrical drawing to estimate visible, so your team can move quickly without losing the decisions behind the number.

Metruno sample quantity review: eight new Type B lights and two removals, each linked to E101
Riverside Office fit-out · Source-linked quantity reviewReview quantities against the drawing before they enter the estimate.
01

Upload and choose the electrical sheets

Preview a supported PDF of up to 150 pages and 100 MB. Choose up to 25 pages to process on the free project, wherever they occur in the source PDF. The original file stays attached.

02

Select a symbol and search

Choose a representative example and the processed sheets to search. Metruno finds similar shapes, including quarter-turn rotations and small size differences. Use separate selections for different symbols and sheet groups for counts above 200 matches.

03

Review the type, count and scope

Check labels and legends, exclude false matches, and add missed items. Separate new work, existing items and removals. Conductors and raceways are not measured automatically.

04

Export source-linked counts

Save the symbol count and download a CSV with one row per object. Drawing references, page, scope, review state and location stay with the count. Quantity exports contain no prices.

05

Enter your material and labor assumptions

Carry reviewed eligible quantities into pricing. Enter your own material costs, labor hours and labor rate, then apply overhead and markup. Existing items remain outside pricing.

06

Finalize and review later changes

Finalize when the complete plan set, scope and pricing are ready. Partially processed plans cannot be finalized as complete estimates. Final estimates stay locked; source changes are flagged before you create a revision.

Ready to start?

Start with a real plan set.

First project free · process up to 25 sheets · no card required

Start free project