Electrical estimating software
Electrical estimating software built on reviewed takeoff quantities.
Carry reviewed quantities into materials, labor, overhead, and markup. Finalize a locked estimate, and review quantity changes before creating a revision.
You choose the symbols and confirm the counts. Use your own prices for reviewed work; conductors and raceways are not measured automatically.
First project free · process up to 25 sheets · no card required

What you can do
See what makes up the estimate.
The Metruno workflow
An estimate built from quantities you’ve reviewed.
Carry reviewed quantities into materials, labor, overhead, and markup. If source quantities change, Metruno flags the estimate before you create a revision.
See electrical takeoff →
Check the fit
Start small. Keep the scope clear.
Symbol counting searches rendered PDFs, including clear scans, for shapes at similar sizes (±10%) and quarter-turn rotations. Each count supports up to 200 matches; use smaller sheet groups for larger counts. Similar shapes can carry different type labels, so check labels, legends, existing work and missing items before saving. Separate new work, existing items and removals; existing items stay outside pricing.
Use a PDF of 25 sheets or fewer to try the complete workflow free. For larger uploads, preview the PDF and choose up to 25 pages to process on the free project; a partial plan cannot be finalized as an estimate. Saved symbol counts and selected-sheet schedules can be exported separately. Continuing costs $299 USD per workspace per month.
See the calculation
Eight new lights. Two removals. Every cost visible.
This example uses illustrative rates: $85 per new light, $80 per labor hour, 10% overhead and 12% markup. Existing lights stay outside pricing.
Read the worked example →Illustrative rates · USD · 8 new lights and 2 removals
- Materials 8 × $85, plus $0 for removals
- $680.00
- Labor 4.5 hours × $80.00
- $360.00
- Direct cost Materials + labor
- $1,040.00
- Overhead 10% of direct cost
- $104.00
- Markup 12% of direct cost + overhead
- $137.28
- Example estimate total
- $1,281.28
Before your first project
Before pricing your first project.
Are material prices or labor rates supplied?
Use your own material unit costs, labor hours and labor rate, then set overhead and markup. The estimate keeps these assumptions visible; the worked example uses illustrative inputs, not a market price database.
What happens when the drawing quantity changes?
Metruno flags changes to source quantities before you create a revision. Review the changed scope and its cost effect; finalized estimates stay locked.
Can unresolved or existing quantities be priced?
Quantities must be reviewed and eligible to enter pricing. Existing items and excluded objects stay outside pricing. Resolve unclear types and scope against the drawing before using the quantities.
Can I finalize an estimate from selected pages of a larger PDF?
A partially processed plan set cannot be finalized as a complete estimate. Use a PDF of 25 sheets or fewer to evaluate the full workflow on the free project, or process the complete supported plan set on the paid plan.
Guides and downloads
Work through an example.
Practical examples for checking the drawing, organizing counts and pricing reviewed work.
Count electrical symbols in a PDF
Follow the E101 lighting plan from one selected symbol to reviewed, source-linked CSV counts.
Electrical takeoff spreadsheet
Group counts by drawing, page and code. Keep new, existing and removal scope separate, with checks for duplicates.
Turn reviewed takeoff into an estimate
See materials, labor, overhead and markup calculated from a small, clearly scoped set of quantities.
Ready to start?
Start with a real plan set.
First project free · process up to 25 sheets · no card required